Facility Name:
|
Rutland
|
Caller Name And Title:
|
Jeffrey Wennberg, Commissioner
|
Municipality:
|
Rutland
|
Location (street or site):
|
CSO #001 Calvary
|
Incident Start Date:
|
08/04/2020
|
Incident End Date:
|
08/04/2020
|
Incident Start End Times:
|
06:09 pm to 06:49 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
11,730 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
Social media posting
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Jeffrey Wennberg, Commissioner
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm delivering over one-half inch of rain at a maximum rate of 0.80 inches per hour on August 4th resulted in the discharge of a combination of sewage and stormwater from CSO #001, Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HP1-S6MP-E2CJD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|