|
Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland
|
|
|
CSO#004 School St
|
|
|
06/23/2020
|
|
|
06/23/2020
|
|
|
04:12 pm to 04:42 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
13,652 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm delivering 0.30 inches of rain on on June 23 with a maximum rainfall rate of 1.08 inches per hour resulted in the discharge of a combination of sewage and stormwater from CSO #004, Third Base (School St). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP0-QQRE-NYKDJ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|