Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland
|
|
|
CSO#003 and #004 Third Base
|
|
|
05/15/2020
|
|
|
05/15/2020
|
|
|
06:47 pm to 08:03 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
83,780 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
post to social media
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by intense rain which totaled 0.425 inches and fell at a maximum rate of 1.83 inches per hour resulted in the discharge of a combination of sewage and stormwater from CSO#003 and 004 Third Base. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNZ-SKDY-G2CV7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|