Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 4 - Meadow Street - Combined - Third Base, Ball Field
|
|
|
12/09/2019
|
|
|
12/09/2019
|
|
|
05:25 pm to 06:18 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
10,214 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by steady rain totaling 0.71 inches, warm temperatures, and rapidly melting snow on 12/9/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 4 - Meadow Street - Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|