Facility Name:
|
Rutland
|
Caller Name And Title:
|
Mark Breznick / Lab Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
CSO # 4 - Meadow Street - Combined - Third Base, Ball Field
|
Incident Start Date:
|
11/27/2019
|
Incident End Date:
|
11/28/2019
|
Incident Start End Times:
|
11:55 pm to 12:28 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
2,978 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
East Creek
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner of Public Works
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by rain that fell at a peak rate of 0.28 inches per hour, with a total accumulation of 0.79 inches on 11/27-11/28/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 4- Meadow Street - Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HNV-M3TD-ZHQ6W
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|