Waste Water Inventory Website
  
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Rutland    
Caller Name And Title: Mark Breznick / Lab Director    
Municipality: City of Rutland    
Location (street or site): River Street Pump Station    
Incident Start Date: 11/21/2019    
Incident End Date: 11/21/2019    
Incident Start End Times: 08:35 am to 09:00 am    
Estimated Duration Of Event:    
Nature Of Incident: Discharged untreated sewage    
Estimated Volume (gallons): 100 gallons    
Cause Of Discharge: Crack/Hole in Pipe    
Type Of Obstruction: None    
Point Of Discharge: Other    
Corrective Action Taken: When leak was discovered immediately switched over to the other force main. Isolated and shut off the force main with the leak. Drained the force main with the issue back to the pump station wet well in order to prevent any more leakage, and prepare the piping for repair work. Lime will be applied to area where leak occurred to help disinfect, ect.    
Waterbody Impacted: East Creek    
Contact Name And Title For Public: Jeff Wennberg, Commissioner of Public Works    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: Sewer force main leak surfaced in a field approximately 75 feet from the river bank.    
   
nForm Submission Number: HNV-EQ6F-AWFE4