|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
10/17/2019
|
|
|
10/17/2019
|
|
|
02:33 am to 03:53 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
1,222,331 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm, with a rainfall rate that reached 0.94 inches per hour, and a total accumulation of 2.86 inches on 10/17/2019 resulted in the discharge of a combination of sewage and stormwater from CSO #1- Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNT-K87P-GBAC7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|