Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Rutland    
Caller Name And Title: Mark Breznick / Lab Director    
Municipality: City of Rutland    
Location (street or site): CSO # 1 - Calvary Cemetery    
Incident Start Date: 09/23/2019    
Incident End Date: 09/23/2019    
Incident Start End Times: 08:47 pm to 09:52 pm    
Estimated Duration Of Event:    
Nature Of Incident: Authorized Wet Weather CSO Overflow    
Estimated Volume (gallons): 36,291 gallons    
Cause Of Discharge: High Flows    
Type Of Obstruction: None    
Point Of Discharge: Combined sewer overflow structure    
Corrective Action Taken: None    
Waterbody Impacted: Otter Creek    
Contact Name And Title For Public: Jeff Wennberg, Commissioner of Public Works    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: High flows caused by heavy rain that fell at a peak rate of 0.89 inches per hour with a total accumulation of 0.53 inches on 9/23/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
nForm Submission Number: HNT-0XWE-G1X2F