|
Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland City
|
|
|
Third Base CSO#003 and CSO#004
|
|
|
07/30/2019
|
|
|
07/30/2019
|
|
|
06:12 pm to 07:47 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
51,336 Gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Public notice on social media
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a rain storm lasting an hour and fifteen minutes and delivering 0.43 inches of rain with a maximum rate of 0.7 inches per hour on July 30th resulted in the discharge of a combination of sewage and stormwater from CSO#003 and CSO#004, Third Base. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNR-NC2W-KDTWR
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|