Facility Name:
|
Rutland
|
|
|
Mark Breznick / Director
|
|
|
City of Rutland
|
|
|
CSO # 2 - Home Plate - Ball Field
|
|
|
06/11/2019
|
|
|
06/11/2019
|
|
|
03:35 am to 04:09 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
65,383 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a rate of 0.14 inches per hour for a short time, with a total accumulation 0.54 inches on 6/11/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 2 - Home Plate - Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNQ-EKPV-SNG5P
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|