|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 4 - Meadow Street Combined - Third Base, Ball Field
|
|
|
05/28/2019
|
|
|
05/28/2019
|
|
|
02:13 pm to 03:49 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
19,972 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by rain that fell consistently throughout an 8 hour period of the day, accumulating to 0.696 inches, with a maximum rate of 0.33 inches per hour on 5/28/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 4 - Meadow Street Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNQ-3SAG-XC04Y
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|