|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
05/19/2019
|
|
|
05/20/2019
|
|
|
08:48 pm to 03:15 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
1,527,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain fall that reached a rate of 2.29 inches per hour for a period of time, with a total accumulation of 1.12 inches on 5/19/2019 resulted in the discharge of a combination of sewage and stormwater from CSO # 1- Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNP-X41R-RY53M
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|