|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 4 - Meadow Street - Third Base, Ball Field, Combined
|
|
|
02/05/2019
|
|
|
02/05/2019
|
|
|
01:33 pm to 03:38 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
12,959 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by rapid snow melt, due to unusually warm temperatures on 2/5/2019 resulted in the discharge of a combination of sewage and snow melt water from CSO #4 - Meadow Street- Third Base, Ball Field,Combined. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 56,501 gallons of urban storm water were treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|
HNM-BSNH-YZE5F
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|