|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
CSO #1 - Calvary Cemetery
|
|
|
02/05/2019
|
|
|
02/05/2019
|
|
|
02:55 pm to 06:51 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
358,028 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by rapid snow melt, due to unusually warm temperatures on 2/5/2019 resulted in the discharge of a combination of sewage and snow melt water from CSO #1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 1,561,002 gallons of urban storm water were treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|
HNM-BS9F-RAFXZ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|