|
Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland City
|
|
|
CSO #003 and CSO#004 - Third Base
|
|
|
01/24/2019
|
|
|
|
|
|
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Notice via social media
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A major rain event that has dropped 2.4" of rain since midnight and continues at this time, coupled with frozen ground and major snow melt resulted in a discharge of a combination of sewage and stormwater from CSO#003 and #004 Third Base. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNM-2BJM-G7M6H
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|