Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
CSO #4 - Meadow Street - Through Third Base Combined Structure
|
|
|
12/28/2018
|
|
|
12/28/2018
|
|
|
11:28 am to 02:33 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
63,248 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Steady rain that totaled 0.66 inches in less than 6 hours, along with melting ice and snow in roadways caused high flows on 12/28/2018. Which resulted in the discharge of a combination of sewage and stormwater from CSO #4 - Meadow Street through the Third Base structure. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 275,761 gallons of urban storm water were treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|