|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
CSO #1 - Calvary Cemetery
|
|
|
12/21/2018
|
|
|
12/21/2018
|
|
|
12:54 pm to 02:19 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
300,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by 0.98 inches of rain during a 14 hour time frame on 12/21/2018 resulted in the discharge of a combination of sewage and stormwater from CSO #1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 1,308,000 gallons of urban storm water were treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|
HNK-7KXQ-HG1SF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|