|
Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commisioner
|
|
|
Rutland City
|
|
|
Third Base CSO#3 and CSO #4
|
|
|
08/17/2018
|
|
|
08/17/2018
|
|
|
07:35 pm to 08:36 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
96,172 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Public notice via social media
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a downpour lasting 1 hour 40 minutes and delivering nearly half an inch of rain this evening resulted in the discharge of a combination of sewage and stormwater from Third Base CSO #3 and #004 (School St and Meadow St). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNG-4NTV-F0EC1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|