|
Facility Name:
|
Rutland
|
|
|
Rod Munroe/ Lab Director
|
|
|
City of Rutland
|
|
|
Calvery Cemetary
|
|
|
07/26/2018
|
|
|
07/26/2018
|
|
|
01:40 am to 02:15 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
40,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 07/26/18 resulted in the discharge of a combination of sewage and stormwater from CSO#001- Calvery Cemetary . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, 174,400 gallons of urban stormwater was treated through the wastewater treatment plant that would have otherwise gone into the receiving stream.
|
|
|
|
|
|
HNF-K4KH-V72VM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|