Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Rutland    
Rod Munroe/ Lab Director    
City of Rutland    
Calvery Cemetary    
07/26/2018    
07/26/2018    
01:40 am to 02:15 am    
   
Authorized Wet Weather CSO Overflow    
40,000 gallons    
High Flows    
None    
Combined sewer overflow structure    
None    
Otter Creek    
Jeff Wennberg, Commissioner of Public Works, City of Rutland    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 07/26/18 resulted in the discharge of a combination of sewage and stormwater from CSO#001- Calvery Cemetary . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, 174,400 gallons of urban stormwater was treated through the wastewater treatment plant that would have otherwise gone into the receiving stream.    
   
HNF-K4KH-V72VM