Facility Name:
|
Rutland
|
Caller Name And Title:
|
Rod Munroe/ Lab Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
Third Base: Meadow Street CSO#003 and School Street CSO#004
|
Incident Start Date:
|
07/25/2018
|
Incident End Date:
|
07/25/2018
|
Incident Start End Times:
|
10:50 am to 01:16 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
70,043 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
East Creek
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 07/25/18 resulted in the discharge of a combination of sewage and stormwater from CSO#009- School and Meadow Street combined, CSO#003 and #004. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, 2,919,042 gallons of urban storm water was treated through the wastewater treatment plant that would have otherwise gone into the receiving stream.
|
|
|
nForm Submission Number:
|
HNF-JHC6-ZN934
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|