Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland City
|
|
|
Third Base - CSO#003
|
|
|
07/10/2018
|
|
|
07/10/2018
|
|
|
04:42 pm to 04:52 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
94,180 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Public notice by social media
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on July 10 (0.32 inches in 1 hour with a peak rate of nearly 1.2 inches per hour) resulted in the discharge of a combination of sewage and stormwater from CSO #003, Third Base. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. During this event over 400,000 gallons of stormwater was treated at the Rutland treatment plant.
|
|
|
|
|
|