Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland City
|
|
|
Calvary Cemetery CSO#001
|
|
|
07/06/2018
|
|
|
07/06/2018
|
|
|
07:15 am to 07:56 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
208,206
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Public notification via social media.
|
|
|
Otter Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm delivering over 1.5 inches of rain on July 6th resulted in the discharge of a combination of sewage and stormwater from CSO #001, Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. During the same time over 900,000 gallons of stormwater was treated at the Rutland treatment plant.
|
|
|
|
|
|
HNF-3DXX-PPBQF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|