Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
City of Rutland
|
|
|
Third Base - CSO #3 (School St)
|
|
|
06/18/2018
|
|
|
06/18/2018
|
|
|
04:32 pm to 04:57 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
41,816 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
In addition to the required 1-hour alert, the general public was notified through social media.
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 18 resulted in the discharge of a combination of sewage and stormwater from CSO #3, Third Base. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, over 182,000 gallons of stormwater was treated at the treatment plant during this 25 minute event. The estimated wastewater volume of this overflow was 2,800 gallons.
|
|
|
|
|
|