|
Facility Name:
|
Rutland
|
|
|
Rod Munroe/ Lab Director
|
|
|
City of Rutland
|
|
|
School Street
|
|
|
05/26/2018
|
|
|
05/26/2018
|
|
|
11:48 pm to 11:57 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
3,530 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 5/26/18 resulted in the discharge of a combination of sewage and stormwater from CSO#003- School Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 15,391 gallons of urban storm water was treated through the waste water treatment plant before being discharged into the receiving stream.
|
|
|
|
|
|
HNE-43HJ-CNGB8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|