Facility Name:
|
Rutland
|
Caller Name And Title:
|
Rod Munroe / Lab Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
Calvary Cemetery
|
Incident Start Date:
|
02/21/2018
|
Incident End Date:
|
02/21/2018
|
Incident Start End Times:
|
12:26 pm to 03:49 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
212,852 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by rapid snow melt and unusually warm weather on 2/21/2018 resulted in the discharge of a combination of sewage and stormwater from CSO #001 - Calvary Cemetary . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 928,035 gallons of urban stormwater was treated through the wastewater treatment facility before returning it to the environment.
|
|
|
nForm Submission Number:
|
HNB-SJ68-T1HQH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|