Facility Name:
|
Rutland
|
Caller Name And Title:
|
Rod Munroe / Lab Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
Calvary Cemetary
|
Incident Start Date:
|
01/23/2018
|
Incident End Date:
|
01/23/2018
|
Incident Start End Times:
|
09:52 am to 12:52 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
125,300 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 01/23/18 resulted in the discharge of a combination of sewage and stormwater from CSO #001 - Calvary Cemetary. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 546,308 gallons of urban stormwater were treated through the wastewater treatment facility before returning to the environment.
|
|
|
nForm Submission Number:
|
HNB-2PNM-G5C2D
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|