|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
Calvery Cemetary
|
|
|
08/22/2017
|
|
|
08/22/2017
|
|
|
08:21 pm to 09:28 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
46,900 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/22/2017 resulted in the discharge of a combination of sewage and stormwater from CSO #001 - Calvery Cemetary. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 204,484 gallons of urban stormwater was treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|
HN7-A2HS-74R3V
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|