Facility Name:
|
Rutland
|
|
|
Rod Munroe/ Lab Director
|
|
|
City of Rutland
|
|
|
School Street
|
|
|
08/19/2017
|
|
|
08/19/2017
|
|
|
01:32 am to 02:05 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
19,800 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Copmmissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/19/17 resulted in the discharge of a combination of sewage and stormwater from CSO #003, School Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, 86,328 gallons of urban stormwater was treated through the wastewater treatment facility before returning it to the environment.
|
|
|
|
|
|