|
Facility Name:
|
Rutland
|
|
|
Rod Munroe/ Lab Director
|
|
|
City of Rutland
|
|
|
Calvery Cemetary
|
|
|
07/08/2017
|
|
|
07/08/2017
|
|
|
04:57 pm to 05:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
24,500 Gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/8/17 resulted in the discharge of a combination of sewage and stormwater from CSO #001-Calvery Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, approximately 171,500 gallons of storm water was treated during this event that would have otherwise gone into the creek.
|
|
|
|
|
|
HN6-6DV1-MTMWH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|