Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Rutland    
Caller Name And Title: Rod Munroe/ Lab director    
Municipality: City of Rutland    
Location (street or site): Homeplate Ballfield    
Incident Start Date: 07/07/2017    
Incident End Date: 07/07/2017    
Incident Start End Times: 11:05 pm to 11:35 pm    
Estimated Duration Of Event:    
Nature Of Incident: Authorized Wet Weather CSO Overflow    
Estimated Volume (gallons): 21,000 gallons    
Cause Of Discharge: High Flows    
Type Of Obstruction: None    
Point Of Discharge: Combined sewer overflow structure    
Corrective Action Taken: None    
Waterbody Impacted: East Creek    
Contact Name And Title For Public: Jeff Wennberg, Commissioner of Public Works, City of Rutland    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: High flows caused by an intense rain storm on 7/7/17 resulted in the discharge of a combination of sewage and stormwater from CSO #002-Homeplate Ballfield . Approximately 0.4 inches fell in fifteen minutes. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during this event, approximately 91,560 gallons of urban stormwater was treated through the wastewater treatment facility before returning to the environment.    
   
nForm Submission Number: HN6-62CW-9S0HM