Facility Name:
|
Rutland
|
|
|
Rod Munroe/ Lab Director
|
|
|
Rutland City
|
|
|
Third Base. CSO#009- School and Meadow Street combined.
|
|
|
04/01/2017
|
|
|
04/01/2017
|
|
|
04:15 pm to 04:30 pm
|
|
|
|
|
|
Other
|
|
|
11,550 gallons
|
|
|
Pump Malfunction
|
|
|
Air bound pump
|
|
|
Combined sewer overflow structure
|
|
|
One of four pumps became air bound at River Street Pump Station. Operator responded immediately and remedied the situation.
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by melting snow on (03/01/17) resulted in the discharge of a combination of sewage and stormwater from CSO#009- School and Meadow Street combined. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|