Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Rutland    
Rod Munroe/ Lab Director    
Rutland City    
Third Base. CSO#009- School and Meadow Street combined.    
04/01/2017    
04/01/2017    
04:15 pm to 04:30 pm    
   
Other    
11,550 gallons    
Pump Malfunction    
Air bound pump    
Combined sewer overflow structure    
One of four pumps became air bound at River Street Pump Station. Operator responded immediately and remedied the situation.    
East Creek    
Jeff Wennberg, Commissioner of Public Works, City of Rutland    
   
   
nForms    
Y    
   
   
   
High flows caused by melting snow on (03/01/17) resulted in the discharge of a combination of sewage and stormwater from CSO#009- School and Meadow Street combined. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HN3-S89W-M8PP5