|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
Calvery Cementary
|
|
|
12/18/2016
|
|
|
12/18/2016
|
|
|
06:05 am to 06:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
28,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 12/18/16 may have resulted in the discharge of a combination of sewage and stormwater from CSO #001-Calvery Cemetary. This is an authorized discharge and if confirmed, is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition to this event, 122,080 gallons of stormwater was treated at our waste water facility during this overflow event that would have otherwise gone into the receiving stream.
|
|
|
|
|
|
2MX-TQXQ-99H6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|