|
Facility Name:
|
Rutland
|
|
|
Rod Munroe/Lab Director
|
|
|
City of Rutland
|
|
|
Meadow and School Street Combined
|
|
|
09/11/2016
|
|
|
09/11/2016
|
|
|
07:24 am to 08:24 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 9/11/16 may have resulted in the discharge of a combination of sewage and stormwater from CSO #009- Meadow and School street combined. If confirmed, this is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, during the overflow event, 183,120 gallons of urban stormwater was treated at our wastewater facility before returning to the environment
|
|
|
|
|
|
2JG-YHGC-0HKA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|