|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
City of Rutland
|
|
|
School and Meadow Street Combined-3rd Base
|
|
|
06/05/2016
|
|
|
06/05/2016
|
|
|
06:40 pm to 08:08 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 06/05/2016 may have resulted in the discharge of a combination of sewage and stormwater from CSO #003 and #004 (CSO #009)- School and Meadow Street combined. If confirmed, this is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2G3-ZKD2-5X1H
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|