|
Facility Name:
|
Rutland
|
|
|
Rod Munroe / Lab Director
|
|
|
Rutland City
|
|
|
School and Meadow Street combined
|
|
|
02/03/2016
|
|
|
02/03/2016
|
|
|
11:30 am to 12:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
One pump became partially plugged due to
|
|
|
Combined sewer overflow structure
|
|
|
Operators responded quickly to isolate and unplug pump, putting a backup pump on line to handle high flows caused by intense rain event.
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works, Rutland City
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm and partially plugged pump on 02.03.16 may have resulted in the discharge of a combination of sewage and stormwater from CSO #009( CSO#3 and CSO#4-School and Meadow Street combined). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2D3-4NM0-SAZP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|