|
Facility Name:
|
Northfield
|
|
|
Patrick Demasi Utilites Superintendent
|
|
|
Northfield
|
|
|
East Street outfall
|
|
|
09/06/2018
|
|
|
09/06/2018
|
|
|
09:30 am to 09:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Dog River
|
|
|
Jeff Schulz
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by intense rain storm on 9-6-2018 resulted in the discharge of a combination of sewage and storm water from CSO East Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes or buildings.
|
|
|
|
|
|
HNG-M1EK-810DF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|