|
Facility Name:
|
Northfield
|
|
|
Patrick DeMasi Utility Superintendent
|
|
|
Northfield
|
|
|
East St.
|
|
|
08/03/2017
|
|
|
08/03/2017
|
|
|
05:48 pm to 06:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Dog River
|
|
|
East St. Overflow
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8-3-2017 resulted in the discharge of a combination of sewage and storm water from CSO on East St. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HN6-XKFE-S6GJY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|