|
Facility Name:
|
Northfield
|
|
|
Peter Demasi Operator
|
|
|
Northfield
|
|
|
East St
|
|
|
08/12/2016
|
|
|
08/13/2016
|
|
|
07:00 pm to 07:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Dog River
|
|
|
Jeff Schulz
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm resulted in the discharge of a combination of sewage and stormwater from CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2HV-ADMS-Y21H
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|