|
Facility Name:
|
Northfield
|
|
|
Patrick DeMasi
|
|
|
Northfield
|
|
|
East St. CSO 004
|
|
|
07/18/2016
|
|
|
07/18/2016
|
|
|
06:20 pm to 06:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Dog River
|
|
|
Jeff Shultz
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/18/2016 resulted in the discharge of a combination of sewage and stormwater from CSO 004 on East Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2H6-3QKE-T6T6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|