|
Facility Name:
|
Northfield
|
|
|
Patrick DeMasi Utility Superintendent
|
|
|
Northfield
|
|
|
East St. CSO -004
|
|
|
07/01/2016
|
|
|
07/01/2016
|
|
|
07:00 pm to 08:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Dog River
|
|
|
Jeff Shultz Town Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on July 1 resulted in the discharge of a combination of sewage and stormwater from East St. CSO-004. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2GV-YZ1R-HES7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|