Facility Name:
|
Lyndon
|
|
|
Charlie Taylor
|
|
|
Lyndonville
|
|
|
Broad Street
|
|
|
10/11/2025
|
|
|
10/11/2025
|
|
|
12:00 pm to 03:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
150
|
|
|
Obstruction/Blockage
|
|
|
Grease
|
|
|
Manhole
|
|
|
The line crew went out with the vactor truck and jetted out the line to remove the obstruction. Work was completed at 3 30pm and sewer was flowing freely
|
|
|
Drainage ditch leading to Passumpsic Riv
|
|
|
Charlie Taylor Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Sewer was reported bubbling out of a manhole at the entrance to Lyndonville Hardware at 12 pm and running into a parallel drainage ditch due to an obstruction in the main
|
|
|
|
|
|
HQG-8WN6-GMX10
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|