Facility Name:
|
Middlebury
|
|
|
Ashliegh Belrose, Interim Superintendent
|
|
|
Town of Middlebury
|
|
|
243 Industrial Ave, Middlebury, VT 05753
|
|
|
09/09/2026
|
|
|
09/11/2026
|
|
|
09:00 am to 11:00 am
|
|
|
|
|
|
Other
|
|
|
695500
|
|
|
Unknown
|
|
|
|
|
|
WWTF outfall
|
|
|
Action measures are as follows:
-We are currently cleaning UV bank 1A lamps today, 9/9. (Last cleaned 8/14).
-Tomorrow (9/10) we will replace all bulbs on UV disinfection unit Bank 1B as they are approaching the end of their life cycle.
-Effluent UV Channel cleaned.
-Resampling from Basin 2 for E.Coli on 9/10 after bulb cleaning and replacement.
-24-hour E.Coli test read on 9/11 showed normal E.Coli reading
|
|
|
Otter Creek
|
|
|
Ashliegh Belrose
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
We had an exceedance of our E.coli limitations during this morning's (9/9/26) testing from Basin 2.
The count was 613.1, Limit 300.
We had to re-seed Basin 2 recently due to a high loss of solids and overfeeding that resulted from the broken influent valves. Basin 2 is still re-establishing. Broken valves were repaired the third week of August.
We are aware of a shock load from AgriMark Friday night (9/4) as well. It was reported that 10,000 gallons of milk drained from the AgriMark silo. While 8,000 gallons was successfully diverted, ~2,000 gallons of milk was diluted into ~150,000 gallons of EQ. It was unclear at the time how much of the milk was diverted, so AgriMark attempted to contact the Town to make them aware but the message was received days later (holiday weekend) because proper protocol for communicating was not followed.
|
|
|
|
|
|
HQR-EPEB-1J7N9
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|