|
Facility Name:
|
Middlebury
|
|
|
Dean Rheaume, Operator
|
|
|
Middlebury
|
|
|
S/N 002 CSO 001 Pump Station No. 9 -668 Weybridge ST
|
|
|
06/18/2026
|
|
|
06/18/2026
|
|
|
01:59 pm to 04:19 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
17682
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Emmalee Cherington
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 18, 2026 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system, to prevent from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQP-DGAH-8F2TC
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|