|
Facility Name:
|
Middlebury
|
|
|
Dean Rheaume, Operator
|
|
|
Middlebury
|
|
|
S/N 003 CSO 002 Pump Station No. 3 274 Weybridge St
|
|
|
06/18/2026
|
|
|
06/18/2026
|
|
|
02:10 pm to 03:41 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
75000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Emmalee Cherington
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 18,2026 resulted in the discharge of a combination of sewage and stormwater from CSO 002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQP-DG8M-1C74W
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|