Facility Name:
|
Middlebury
|
|
|
Jeremy Rathbun Wastewater Superintendent
|
|
|
Town of Middlebury
|
|
|
WWTF
|
|
|
09/10/2025
|
|
|
09/10/2025
|
|
|
01:00 am to 08:00 am
|
|
|
|
|
|
Discharged partially treated disinfected effluent
|
|
|
50000
|
|
|
Mechanical Failure
|
|
|
|
|
|
WWTF outfall
|
|
|
An attempt was made to repair the DO sensor, but parts are no longer availible and the last of the (used) spare parts was determined to be non-functional when installed. A backup control mode was implemented. This control mode was tested and the effluent sampled to confirm permit complaince. The fix was implemented within 2 hours of discovery of the issue.
|
|
|
Otter Creek
|
|
|
Jeremy Rathbun Wastewater Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The Dissolved Oxygen Sensor for SBR-2 failed. This led to an incorrect DO reading being sent to the control system and under aeration of SBR-2 during the aerobic treatment phase. This caused a discharge with more solids than allowed by permit. The issue was noticed and corrected immediatly when the operators arrived in the morning.
|
|
|
|
|
|