Facility Name:
|
Middlebury
|
Caller Name And Title:
|
Jeremy Rathbun Wastewater Syperintendent
|
Municipality:
|
Town of Middlebury
|
Location (street or site):
|
EETF
|
Incident Start Date:
|
08/13/2025
|
Incident End Date:
|
08/13/2025
|
Incident Start End Times:
|
10:30 am to 10:40 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged partially treated disinfected effluent
|
Estimated Volume (gallons):
|
10000
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
The decant was manually stopped.
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Jeremy Rathbun Wastewater Superintendent
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
The plant was switched from 3-Basin to 4-Basin mode as the 4-week rehab of SBR-4 was completed. The timing of the settle cycle of Basin-3 was affected by being shortened by 10-15 minutes. During decant I observed cloudy decant as the decant was wicking sludge from the sludge blanket.
|
|
|
nForm Submission Number:
|
HQE-TEYN-YJQJH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|