Facility Name:
|
Middlebury
|
Caller Name And Title:
|
Jeremy Rathbun Wastewater Superintendent
|
Municipality:
|
Town of Middlebury
|
Location (street or site):
|
Main Pump Station
|
Incident Start Date:
|
05/31/2025
|
Incident End Date:
|
05/31/2025
|
Incident Start End Times:
|
04:45 pm to 05:15 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
2000
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Other
|
Corrective Action Taken:
|
The problem was diagnosed as the AO board and a spare board was swapped in solving the issue.
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Jeremy Rathbun Wastewater Superintendent
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
An analogue output control board failed at our main pump station during heavy rains causing the pumps to run less than full speed. The issue was discovered by the on call operator and they immediately requested assistance. A small overflow occurred while the system was being repaired
|
|
|
nForm Submission Number:
|
HQD-0HZS-6QRCD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|