Facility Name:
|
Middlebury
|
|
|
Jeremy Rathbun Wastewater Superintendent
|
|
|
Town of Middlebury
|
|
|
Main Pump Station
|
|
|
05/31/2025
|
|
|
05/31/2025
|
|
|
04:45 pm to 05:15 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
2000
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
The problem was diagnosed as the AO board and a spare board was swapped in solving the issue.
|
|
|
Otter Creek
|
|
|
Jeremy Rathbun Wastewater Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
An analogue output control board failed at our main pump station during heavy rains causing the pumps to run less than full speed. The issue was discovered by the on call operator and they immediately requested assistance. A small overflow occurred while the system was being repaired
|
|
|
|
|
|
HQD-0HZS-6QRCD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|