Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Middlebury    
Caller Name And Title: Jeremy Rathbun Wastewater Superintendent    
Municipality: Town of Middlebury    
Location (street or site): Main Pump Station    
Incident Start Date: 05/31/2025    
Incident End Date: 05/31/2025    
Incident Start End Times: 04:45 pm to 05:15 pm    
Estimated Duration Of Event:    
Nature Of Incident: Authorized Wet Weather CSO Overflow    
Estimated Volume (gallons): 2000    
Cause Of Discharge: Other    
Type Of Obstruction:    
Point Of Discharge: Other    
Corrective Action Taken: The problem was diagnosed as the AO board and a spare board was swapped in solving the issue.    
Waterbody Impacted: Otter Creek    
Contact Name And Title For Public: Jeremy Rathbun Wastewater Superintendent    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: An analogue output control board failed at our main pump station during heavy rains causing the pumps to run less than full speed. The issue was discovered by the on call operator and they immediately requested assistance. A small overflow occurred while the system was being repaired    
   
nForm Submission Number: HQD-0HZS-6QRCD