Facility Name:
|
Middlebury
|
|
|
Robert Wells, Wastewater Superintendent
|
|
|
Middlebury
|
|
|
206 Lucius Shaw Lane
|
|
|
08/03/2023
|
|
|
08/03/2023
|
|
|
08:30 pm to 04:50 am
|
|
|
|
|
|
Other
|
|
|
>100,000 to 500,000 gallons
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
Repaired what we could. Electrician called in along with all wastewater staff.
|
|
|
Otter Creek
|
|
|
Robert Wells, Middlebury Wastewater Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Approximately 3 - 4 foot high wave of storm water came down Lucius Shaw Lane and blew thru our doors. Flooding our dry well and disabling our pumps. Pumped out the dry well, contacted and electrician to get 2 of the 3 pumps back operating. Pumps were operational at 2;20 AM but the flow was too great for the two pumps and continued to discharge until approximately 4:50 AM.
Rain totals were estimated between 7-12 inches within the 5 hour period.
|
|
|
|
|
|