Facility Name:
|
Essex Junction
|
Caller Name And Title:
|
Chelsea Mandigo
|
Municipality:
|
Essex Junction
|
Location (street or site):
|
Susie Wilson Road
|
Incident Start Date:
|
11/25/2024
|
Incident End Date:
|
11/25/2024
|
Incident Start End Times:
|
11:38 am to 11:40 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
50
|
Cause Of Discharge:
|
Mechanical Failure
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Stormwater collection system
|
Corrective Action Taken:
|
The correct button was pressed within 30 seconds. The Vac truck cleaned the basin that wastewater go into. It did not spread to the neighboring basin. They also washed down the road while they were sucking the basin to make sure no wastewater was left on the road
|
Waterbody Impacted:
|
None
|
Contact Name And Title For Public:
|
Chelsea Mandigo, Water Quality Superintendent
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Replacing a gate valve and check valve at pump station. Bypass valve was frozen shut so had to bypass pump station manually with Vac truck and pump truck. Vac truck was just emptied by pump truck and was about to start pumping again but the wrong button on the control was pushed causing a loss of suction and allowing some of what was in the hose to come out for less than 30 seconds
|
|
|
nForm Submission Number:
|
HQ8-DHSW-G62TM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|