Facility Name:
|
Essex Junction
|
|
|
James Jutras, Water Quality Superintendent
|
|
|
Essex Jct
|
|
|
Wastewater facility control building northwest corner
|
|
|
03/09/2021
|
|
|
03/09/2021
|
|
|
08:00 am to 08:45 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100 to 1,000 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
N/A
|
|
|
Stormwater collection system
|
|
|
Pumps are being isolated to determine the cause and to isolate it if possible. Water is being collected and pumped to the process and contained in a vacuum truck. An excavation contractor is in transit.
|
|
|
winooski
|
|
|
James Jutras, Water Quality Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Staff discovered slow upwelling from the ground on inspection rounds. The water is filtering through the ground and flowing through grass prior do the catch basin. Downstream basins will be pumped out to prevent conveyance to the stormwater system discharge.
|
|
|
|
|
|
HP7-304X-JBDMK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|